warrington

National Grid

National Grid were having difficuty with a valve assembly attached to the top of a compressor unit. Height access was an issue to carry out measurements of the unit.

3d Surveyscan were invited to carry out a survey of the compressor plant room.

The height problem was overcome with the use of our 7 Meter Mast with remote start for our laser scanner. this negated the problem of having to erect scaffolding.

Scan data was used to produce an accurate and precise drawing of the compressor unit. A design for a new supporting bracket was produced which has now been succesfully installed.

Click on image to expand view.